Photo is taken in Kilrush, where the Limerick Unit do much of their training.
River Shannon - Google Maps
Many marinas, where rib use is popular have slips like these. The Coast Guard unit in Crosshaven have had one in the RCYC for some time.
I think I saw one in the Basin at Haulbowline too?
Announcement
Collapse
No announcement yet.
Replacement NSR Launch / New NS Port Security Launches
Collapse
X
-
Originally posted by na grohmiti View PostAnything stirring?
Clock is ticking surely?
- 1 like
Leave a comment:
-
Originally posted by na grohmiti View PostOdd to be writing a TI before they type of vessel is even selected. Closing date was just yesterday. I assume standstill period now for next few weeks before any assessment of responses.Last edited by ancientmariner; 21 May 2021, 19:41.
- 1 like
Leave a comment:
-
Originally posted by apod View PostThree new Draft NSR "Motor Launch" training syllabi popped up on the newsfeed on Ikon yesterday. Looks like they are getting ready for them. No mention of Gunnery on them though which is unusual as I believe the spec allowed for the vessels to mount weapons as required.
- 1 like
Leave a comment:
-
Odd to be writing a TI before they type of vessel is even selected. Closing date was just yesterday. I assume standstill period now for next few weeks before any assessment of responses.
- 1 like
Leave a comment:
-
Three new Draft NSR "Motor Launch" training syllabi popped up on the newsfeed on Ikon yesterday. Looks like they are getting ready for them. No mention of Gunnery on them though which is unusual as I believe the spec allowed for the vessels to mount weapons as required.
- 1 like
Leave a comment:
-
Originally posted by A/TEL View Post
Weather window in the spring/summer should allow at least 3 to RV on the east coast. I remember in the 2000s 3 of the current boats operating off Arklow.
- 1 like
Leave a comment:
-
Originally posted by ancientmariner View Post
Use WHITTEN's or KENNEDY's Boat Haulage to get them together the rest is paperwork. By sea is possible with a fixed weather window.
- 1 like
Leave a comment:
-
Originally posted by ancientmariner View Post
Use WHITTEN's or KENNEDY's Boat Haulage to get them together the rest is paperwork. By sea is possible with a fixed weather window.
P31 has a former helideck that could easily accommodate a motor launch at 15m LOA x 6m Beam. Engineers already cleared the helideck to carry 8x TEU, 2 wide 2 long and 2 high, but it was never put into practice.
Leave a comment:
-
Originally posted by na grohmiti View Post
Going by the dimensions in the tender, and from witnessing one of the potential builders delivering his finished product, it's worth remembering that these are considered oversize loads, and require special permits from AGS to travel.
However that does not prevent them being brought together by sea, either under their own power, or as deck cargo.
- 1 like
Leave a comment:
-
If we get anything remotely like whats proposed, you won't be long spilling your G&T.
There was an element for years that saw the NSR as some form of sailing club. Like the Tea Drinkers of the army reserve, these folk wouldn't be seen dead in a drysuit, because it would hide the shoulder boards when they needed to visit the local YC for the inevitable "debrief". Spending weekends on ageing STYs marshalling the local regatta was their idea of Naval activity.
If it works out as is hoped, the Naval Reserve will have to get in early to book time with the craft, such will be the usage from other Naval Units.
I too am optimistic about this asset.
Leave a comment:
-
Originally posted by Auldsod View PostI think we are sweating a lot on the technical details of these MLs but to echo A/TEL, the real to the NS and NSR will be in their utility.
Due to the sheer size of the investment, this is going to be a massive shot in the arm into all of the NSR units. The units have a fantastic opportunity ahead but they have to step up. There is no doubt that there will have to be much initial support and continuing support from the PDF here as these expensive assets cannot simply be not left idle when they arrive.
The Cork based ML will receive extensive use as A/TEL states but there will need to a lot of engagement with the other three boats. Personally, I'm very optimistic about the years ahead.
If only the rest of the AR was given opportunity like this.Last edited by batterysgt; 19 May 2021, 18:43.
Leave a comment:
-
Originally posted by ancientmariner View Post
The operation , Base facilities, secure berthing, and access for NSR members will be important. They will need a continuum of NS housekeeping to ensure readiness and "good to go ". Ideally they should work once a year, at least, as a flotilla . The operation of assembling as a Flotilla needs to be provided for by considering boat haulage companies.
However that does not prevent them being brought together by sea, either under their own power, or as deck cargo.
- 1 like
Leave a comment:
Leave a comment: