Originally posted by EUFighter View PostThere is a separate gate and roadway at the end of the bridge before the security barrier. The roadway run parallel to one inside the security fence of the base to what should be a public car-park at the end. See your post #519 (page 21)
[ATTACH]8842[/ATTACH]
The security barrier is just past the separate entrance to the Haulbowline Park.
- Likes 1
Comment
-
Guess that isn’t going to see in increase in the Defence budget
Comment
-
Originally posted by DeV View PostGuess that isn’t going to see in increase in the Defence budget
https://www.gov.ie/en/press-release/...owline-island/
Joking aside, I'm surprised the east tip only cost €25m, because that was where all the nasty stuff was. The buildings are gone, the hardest job now is to fill the various holes and pits that appear at random around the site, and remove the remaining uprights from the old (1970s era) factory buildings. No different to the many factories of the same time that had to have their asbestos roofs replaced in the area. Then you have plenty of space for temporary accommodation until block 9 and 10 and the Hospital are refurbished. Would be great to see a roof on Building 11 again too, but its burning in the 1920s probably had historical significance of some sort.For now, everything hangs on implementation of the CoDF report.
- Likes 1
Comment
-
The US EPA are completing the remediating of the DULUTH Steel works site that occupied an area of over 600 acres and contended with a century of steel working pollution. The estimated costs are in the region of 75m USD and the intention is to return it to residential, commercial and amenity use. The work included dredging adjacent St.Louis river bed. They listed contaminants as oil, coke residues, smelt residues, chemicals, asbestos and other dangerous materials. Our problems are not unique but joint partners will cause Budget overload for somebody. Get on with it and start building for new drydock pump house, dredging and cleaning dock and basin, and complete with accommodation and parking to modern self contained standards.
- Likes 2
Comment
-
Originally posted by ancientmariner View PostThe US EPA are completing the remediating of the DULUTH Steel works site that occupied an area of over 600 acres and contended with a century of steel working pollution. The estimated costs are in the region of 75m USD and the intention is to return it to residential, commercial and amenity use. The work included dredging adjacent St.Louis river bed. They listed contaminants as oil, coke residues, smelt residues, chemicals, asbestos and other dangerous materials. Our problems are not unique but joint partners will cause Budget overload for somebody. Get on with it and start building for new drydock pump house, dredging and cleaning dock and basin, and complete with accommodation and parking to modern self contained standards.For now, everything hangs on implementation of the CoDF report.
- Likes 1
Comment
-
Originally posted by na grohmiti View Post
New CBRN training area..
Joking aside, I'm surprised the east tip only cost €25m, because that was where all the nasty stuff was. The buildings are gone, the hardest job now is to fill the various holes and pits that appear at random around the site, and remove the remaining uprights from the old (1970s era) factory buildings. No different to the many factories of the same time that had to have their asbestos roofs replaced in the area. Then you have plenty of space for temporary accommodation until block 9 and 10 and the Hospital are refurbished. Would be great to see a roof on Building 11 again too, but its burning in the 1920s probably had historical significance of some sort.
Being in the hands of the DoD is a death knell for development of the site in this Century.
- Likes 1
Comment
-
Originally posted by TangoSierra View Post
I think I read that according to the EPA report of the Site, the most contaminated area was around the smelting furnace (towards the North end of the site (next to Block 9/Spencer Jetty).
Being in the hands of the DoD is a death knell for development of the site in this Century.For now, everything hangs on implementation of the CoDF report.
Comment
-
Originally posted by na grohmiti View Post
They will invest in temporary fencing, to keep people out....
Comment
-
I have not been to the "park" yet but I hear complaints from users earlier this week about the lack of bins and the fact the toilet is not yet operational... While they stand on what was the largest open waste dump in the harbour. Am I the only one seeing the irony?For now, everything hangs on implementation of the CoDF report.
- Likes 1
Comment
-
Originally posted by DeV View Post
Remediation of the factory site is now DoD’s responsibility
Comment
-
Originally posted by ancientmariner View Post
Quoting partially from a CCC spokesman's response to a press release issued by an Irish earth Friends group. You will find that remediation will not be a singular task due to the implied compliances. MOD welcomes the co-operation of CCC to carry the project through. Does anybody have an accurate measurement of the remediated site and the remainder yet to be done. Some are saying 11 hectares for the remediated site which amounts to 27 acres while others are describing that portion as 9 acres and the remaining west portion as 11 acres.
May I suggest if this isn't good enough you try measuring it yourself.
Google Maps Area and Distance Calculator | Measure Distance or Area on a Map
I measure the public park as 18.85 Acres or 76309Sq/m. I measured the Former ISPAT factory site as 19 Acres. I did not include any portion of the Basin in my calculation, even though the West Wall of the basin was once part of the Irish Steel/Ispat site. If you combine everything that once was Irish Steel/Ispat, and the portion of the basin used by the NS you have a total of 55 acres, which comes to about 22 and a half Hectares(Not including the water).For now, everything hangs on implementation of the CoDF report.
- Likes 1
Comment
-
Originally posted by na grohmiti View Post
I gave the total area as 19 acres and detailed my source.
May I suggest if this isn't good enough you try measuring it yourself.
Google Maps Area and Distance Calculator | Measure Distance or Area on a Map
I measure the public park as 18.85 Acres or 76309Sq/m. I measured the Former ISPAT factory site as 19 Acres. I did not include any portion of the Basin in my calculation, even though the West Wall of the basin was once part of the Irish Steel/Ispat site. If you combine everything that once was Irish Steel/Ispat, and the portion of the basin used by the NS you have a total of 55 acres, which comes to about 22 and a half Hectares(Not including the water).